03/11/2026 - 26/00070 - Relocation of Tunbridge Wells Family Hub Services to The Amelia Scott, Tunbridge Wells

Proposed decision 

To approve the relocation of Tunbridge Wells Family Hub services from 39a Grove Hill Road, Tunbridge Wells, to The Amelia Scott, Tunbridge Wells

 

Reason for the decision 

The decision is required to approve the relocation of the Tunbridge Wells Family Hub services from 39a Grove Hill Road to The Amelia Scott. The proposed relocation would enable services to continue to be delivered from a central town centre location whilst providing a more accessible, flexible and partnership-focused environment, for children, young people and families. The relocation would also support opportunities for enhanced Family Hub delivery, greater collaboration with partners and more efficient use of the Council’s  estate, whilst avoiding the ongoing maintenance costs and operational challenges associated with operating Grove Hill Road as a standalone building.  

 

Background  

Tunbridge Wells Family Hub currently operates from 39a Grove Hill Road and provides information, advice, guidance, courses, targeted sessions and drop-in support for children, young people and families. The building is a converted Georgian town house over two floors, with limited space, small rooms, no lift access to the first floor and constraints on future expansion. The Amelia Scott is a central public-facing civic, cultural and community building on Mount Pleasant Road, approximately 0.4 miles from the current site, around a 10 minute walk. The proposed accommodation would provide a larger, more accessible open plan and flexible environment for Family Hub delivery, including opportunities for partner working such as health, and an enhanced local offer. 

 

Options (other options considered but discarded) 

Alternative options have been considered, including retaining the current Grove Hill Road site, moving to another KCC freehold building, co-locating in a different partner building, or moving to a newly leased building. These options have not been preferred because they do not address the limitations of the current building, are not currently deliverable in the required town centre location, would increase revenue costs, or would not support the Council’s estate and service delivery objectives. 

 

How the proposed decision supports the Council’s Strategic Statement  

The proposal supports the Council’s strategic approach by helping to make best use of KCC’s estate, maintaining access to services in a central and accessible location, supporting early help and family support, and enabling more joined-up working with partners. It is also consistent with the Council’s focus on financial sustainability, efficient use of buildings and resident-focused service delivery.

 

Decision Maker: Cabinet Member for Integrated Children's Services

Decision due date: Not before 02/12/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Rebecca Anderson

Notice of decision: 03/11/2026

Anticipated restriction: Open


19/10/2026 - 26/00066 - Kent and Medway Spatial Development Strategy - Strategic Planning Board

Proposed decision

 

KCC to approve relevant arrangements to act as host authority for and participate in the incoming Kent & Medway Strategic Planning Board

 

Reason for the decision

 

-      Required in response to the proposed Kent and Medway Strategic Planning Board Regulations 2026 which will establish a Strategic Planning Board for Kent and Medway, relating to the preparation of the Kent and Medway Spatial Development Strategy under the Planning and Compulsory Purchase Act 2004 (as amended by the Planning and Infrastructure Act 2025).

 

Background

 

-      In the English Devolution White Paper 2024, the Government set out its intention to reintroduce strategic planning and place a duty on all areas - regardless of the pace of Local Government Reorganisation or Devolution - to prepare sub regional Spatial Development Strategies (SDSs) across England. 

-      The Planning and Infrastructure Act 2025 (amending the Planning and Compulsory Purchase Act 2004) establishes the relevant legislative framework and provisions which place a duty on combined authorities, combined county authorities, upper-tier councils and unitary authorities to prepare a Spatial Development Strategy for their area. 

-      The legislation also provides the Secretary of State the power to establish Strategic Planning Boards to prepare SDSs on behalf of specified groupings of these authorities.  Kent and Medway is a recognised and well-established geography and is highly likely to be confirmed as one of these groupings when the Government publishes its response to a consultation on proposed geographies across England in winter 2026.

-      If a Mayoral Strategic Authority is established for Kent and Medway, the statutory function and responsibility for preparing the Kent and Medway Spatial Development Strategy would transfer to that Authority.

 

Options (other options considered but discarded)

 

-      The legislation does not allow Kent County Council and Medway Council to voluntarily establish a joint committee, with the proposed Kent and Medway Strategic Planning Board Regulations 2026 creating a Board that Kent County Council will be part of. Once established, the Strategic Planning Board will need to consider appropriate representation from the districts in Kent as the local planning authorities with a duty to prepare Local Plans which will need to be in general conformity with the adopted Kent and Medway Spatial Development Strategy.

 

How the proposed decision supports the Council’s Strategic Statement

 

-      Aim 4: ‘Building better communities’, Objective 5: ‘Ensure that the infrastructure needs of the county to support economic growth and quality of life are fully in place’:

“Building on the Kent and Medway Infrastructure Framework, ensure the new Spatial Development Strategy fully captures Kent’s strategic infrastructure needs and delivers a requirement into the planning system to deliver infrastructure first.”

Decision Maker: Cabinet Member for Economic Development and Special Projects

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Tom Marchant

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00069 - Revenue and Capital Budget Monitoring Report - Q2 2026-27

Proposed decision –

 

Cabinet is asked to:

 

a)    NOTE the revenue and capital forecast outturn position for 2026-27 detailed in the report, and accompanying appendices

b)    AGREE the capital cash limit adjustments

 

 

Decision Maker: Cabinet

Decision due date: 19/11/2026 Decision-making Executive committee

Lead officer: Cath Head

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00068 - Proposed New Paddock Wood Primary School

Proposed decision

 

1) APPROVE the allocation of £13,290,493 from the Children, Young People and Education Services Basic Need Capital Budget to fund the construction activities required to establish a new primary school at Paddock Wood.

 

2) DELEGATE authority to the Director of Infrastructure to take relevant actions including but not limited to negotiating, entering into and finalising the terms of relevant contracts, contract variations or other legal agreements (including granting of leases for utility installations for over 20 years, if necessary. Also subject to any relevant LGR implications as may arise), as required, to implement the decision; and

 

3) AGREE for the Director of Infrastructure, to be the nominated Authority Representative within the relevant agreements, with authority to enter variations as envisaged under the contracts. Variations to contract value to be no more than 10% above the capital funding agreed by the Cabinet Member for Education and Skills without requiring a further Key Decision.

 

Reason for Decision

 

The strategic case, initial pre-construction funding and the initiation of the process for establishing a new primary school in Paddock Wood were endorsed by the Children Young People and Education Cabinet Committee on 12 May 2026. Subsequently the Cabinet Member for Education and Skills took the decision (25/00025) to allocate £1,409,507 from the Children, Young People and Education Services Basic Need Capital Budget to complete the pre-construction design activities and the initiation of the process required to establish the new primary school.

 

Since the Cabinet Member decision was taken, the contractor has completed the Gateway 3 design stage, site investigations have been undertaken and a detailed cost plan has been prepared. The need for the school remains unchanged and forecast demand continues to support the establishment of new provision within the Paddock Wood planning group.

 

A decision is sought to allocate a further £13,290,493 from the Children, Young People and Education Services Basic Need Capital Budget to enable the project to progress through detailed design, construction and opening of the school.

 

 

Background

 

Kent County Council (KCC), as the Local Authority (LA), has a statutory duty to ensure sufficient school places are available. The County Council’s Commissioning Plan for Education Provision in Kent 2026-30 (KCP) is a five-year rolling plan which is updated annually. It sets out our future plans as Strategic Commissioner of Education Provision across all types and phases of education in Kent. A copy of the plan can be viewed from this link:

 

Commissioning Plan for Education Provision - Kent County Council

 

For provision planning purposes KCC’s forecasting methodology produces forecasts according to planning groups.  These planning groups are nationally recognised by central Government.

 

Paddock Wood has seen significant housebuilding in recent years, consequently the forecast for the Paddock Wood planning group shows deficits throughout the KCP Plan period.  In the short term, the demand for places can be accommodated in the neighbouring planning groups or within one of the small schools within the planning group offering over PAN.  However, from 2028-29 the demand is forecast to be 1 FE or greater and there are fewer places available in neighbouring planning groups. This increase in demand is linked to significant expansion of the town and the consequential increase in the population; it is not driven by birth rates within the existing population.

 

To meet this demand for places within the Paddock Wood planning group we will seek to establish a new primary school within the town to open in September 2028.  The new school will include classroom space to accommodate 1FE and core facilities sufficient for 2 FE to support future expansion when needed.  The new school will also include a 26 place nursery and a 14 place SRP.

 

Options

Paddock Wood currently has one primary school that is situated on a compact site that has limited scope for future expansion.  The nearest schools that border Paddock Wood are smaller schools in rural locations with very limited scope for substantial expansion.  They collectively do not have sufficient places available to accommodate the growing demand driven by new housing development. 

 

The nearest schools with places available are within Tonbridge and Tunbridge Wells town centres which would mean travel distances of around 5 miles from the new school site; for many children located to the East of the new school site it would entail greater distances.  Pupils travelling these distances would be eligible for free school transport.  This would have a substantial and long-term impact on KCCs school transport budget.

 

How the proposed decision supports the Council’s strategic statement

This proposal is necessary for KCC to continue to deliver the statutory duty, in a cost-effective way, in line with the guidelines described in KCC’s strategic statement. It will help to maintain

KCC’s strategic role in supporting schools in Kent to deliver accessible, high-quality education provision for all families and meets the following priorities:

 

  • Delivering Better Outcomes for Children and Young People - Access to Local Education: Providing increased capacity ensures children can attend a good local school, reduces travel and supports wellbeing. Meeting Demand: Responds to demographic growth and housing developments, ensuring sufficient places for all primary-aged children.

 

  • Stronger Communities and Localism - Community Cohesion: Keeping children in local schools strengthens community identity and parental engagement, supporting KCC’s vision for resilient communities.

 

Financial Implications 

 

Capital 

Cabinet Member for Education and Skills confirmed the decision (25/00025) to allocate £1,409,507 from the Children, Young People and Education Services Basic Need Capital Budget to complete the pre-construction design activities and the initiation of the process required to establish the new primary school.  These activities have now been substantially completed and have informed the preparation of the contractor's detailed cost plan. 

 

The contractor's Gateway 3 submission identifies a total project cost of £14,700,000. This includes the construction works, fees, risk allowances and other project costs associated with delivery of the scheme.  

 

The decision seeks approval to allocate a further £13,290,493, which together with the £1,409,507 previously approved, will provide the full estimated project funding requirement of £14,700,000. 

 

  

The Gateway 3 cost plan reflects the developed design and incorporates the outcomes of technical investigations undertaken during the pre-construction phase. The cost estimate therefore provides a more robust assessment of the funding required to deliver the scheme than the early-stage assumptions reported previously.  The cost plan also includes allowances for a number of site-specific abnormal costs. These allowances are included within the total project cost and represent the current worst-case position for the budget request.  

 

The project team is working with statutory undertakers, developers and other stakeholders to reduce or avoid these costs where possible and to establish whether any costs should be met by third parties. If alternative solutions are secured, or third-party funding responsibilities are confirmed, the final project expenditure will reduce accordingly. 

 

Capital Costs for mainstream provision are funded through the Basic Need Capital Programme, which is made up from a range of sources including the Basic Need Grant and  Developer Contributions. The Basic Need Grant is the largest contributor to the programme and is provided by the DfE to support local authorities fulfil their statutory duty to ensure there are enough school places for children aged 5 to 16 in their area. The Education capital programme is continuously reviewed, with projects entering and leaving the programme regularly in response to demand and project completions. The latest 2026-27 Basic Need Budget is £127 million. This includes confirmed grant funding from Government up to 2027-28 only. Future year Government grants are yet to be agreed. 

 

There is no prudential borrowing associated with this project or decision, it is funded from external grant and small amounts of developer contributions.  

 

Revenue 

Should the scheme not proceed through to completion, any costs incurred at the time of cessation would become abortive costs and are likely to be recharged to Revenue. This would be reported through the regular financial monitoring reports to Cabinet. This will be a cost to the General Fund.

 

 

Legal Implications

Planning permission will be required for the new school.

 

The Director of Infrastructure in consultation with the Director of Education will be overseeing the scheme to ensure public funds are utilised appropriately.

 

Local authorities must plan for and secure sufficient school places for their area in line with their duties under section 14 of the Education Act 1996.

 

The School Organisation (Establishment and Discontinuance of Schools) Regulations 2013 set out the statutory framework for opening, closing, or altering local-authority-maintained schools in England were updated by The School Organisation (Establishment and Discontinuance of Schools) (Amendment) Regulations 2026, which came into force on 1st September 2026.  The amendment revised the content, publication, and notification rules for competition notices and proposals to establish new maintained schools.

 

Previously, Section 6A of the Education and Inspections Act 2006, provided that local authorities in England were required to seek proposals to establish an ‘academy’ (free school), when a new school was needed; the proposed new school was to be established via “free school presumption” process.  However, under the subsequent amendment, where a local authority think that a new school should be established in their area, it can invite proposals for different types of school (mainstream schools, special schools, alternative provision schools).

 

The updated process for establishing a new school from September 2026 is detailed in the Non-statutory Guidance published in May 2026 [‘Opening new schools Statutory guidance for proposers and decision-makers’].

 

Decision Maker: Cabinet Member for Education and Skills

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Nick Abrahams

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00065 - A226 Galley Hill Road - Future progression and delivery

Proposed decision

 

To approve the acceptance of Department for Transport Structures Fund funding, if awarded, and the progression and delivery of the A226 Galley Hill Scheme

 

Reason for the decision

 

There is a continuing need to address the significant highway and utility infrastructure damage caused by the collapse of A226 Galley Hill on 10 April 2023.

 

Following a report to Environment & Transport Cabinet Committee in May 2026, a Decision (26/00019) was taken to allow the A226 Galley Hill scheme to proceed through to detailed design.

 

To deliver the scheme, the Council has applied for funding through the Department for Transport’s Structures Fund. This funding, if awarded, along with identified match funding, will fully cover the scheme cost. An announcement is expected in Autumn 2026, it is appropriate therefore, to seek a further key decision to accept this funding.

 

The Structures Fund requires the grant to be spent and the infrastructure to be delivered by March 2030. As such, to meet this deadline, it is required to obtain governance approval to progress land acquisition and for procurement to start imminently.   

 

The proposed decision is a key decision as it requires expenditure of more than £1m of secured funding.

 

Background

 

The A226 Galley Hill is a strategically important route linking Dartford, Gravesham and Ebbsfleet, forming part of the Kent Resilient Network and supporting local communities, businesses, and planned growth within Ebbsfleet Garden City. A section of this chalk spine collapsed to the north of Galley Hill, triggering a significant landslide that resulted in the loss of part of the carriageway and footway and caused damage to buried utility infrastructure serving the local area. As a result, the A226 Galley Hill has remained closed since that time.

 

The ongoing closure of the A226 Galley Hill continues to have a significant impact on the surrounding highway network, with diverted traffic, including heavy goods vehicles, using less suitable local routes. The closure has disrupted public transport services, including the Fastrack bus network, and has wider implications for the delivery of planned housing and employment growth in Ebbsfleet and Northfleet. Restoration of the route is therefore considered critical to maintaining network resilience, supporting sustainable transport, and enabling future development in the area.

 

Following the previous decision (26/00019), design work has progressed, concluding the optioneering and appraisal process, and progressing the preliminary design stage. In parallel, further engagement with stakeholders has continued through technical review meetings, including discussions with Natural England regarding SSSI constraints and mitigation. This work has progressed ahead of a Structures Fund decision using identified funding.

 

 

Options (other options considered but discarded)

 

Completely pause all project development work until funding is secured

 

This option has the following significant drawbacks. KCC would place unnecessary delay on a tight delivery programme and reduce our ability to meet the deadlines set by the Structures Fund. Delay at this stage would continue to cause ongoing congestion and have a significant impact on the surrounding highway network, with diverted traffic, including heavy goods vehicles, using less suitable local routes.

 

Completely stop the scheme to reinstate the A226 Galley Hill

 

This is not considered a viable option. Separate legal advice concluded that stopping up of this route would have significant ramifications and did not recommend it as an option for KCC.  Modelling work of this scenario also shows current and future significant congestion completely curtailing all growth across the Ebbsfleet area.

 

How the proposed decision supports the Council’s Strategic Statement

Restoring A226 Galley Hill strongly supports Kent County Council’s Strategic Statement by directly delivering against its core priorities around infrastructure?led growth, resilient communities, and economic stability.

 

The Strategic Statement emphasises an “Infrastructure First” approach to ensure that growth is supported by the right transport and physical infrastructure at the right time. The ongoing closure of Galley Hill has demonstrated the consequences of infrastructure failure, placing pressure on local roads, public transport and communities. Reinstating the route addresses this directly by restoring a critical east–west link and ensuring that infrastructure capacity is in place to support planned housing and employment growth in Ebbsfleet Garden City, Dartford and Gravesham, in line with the Council’s commitment to building better communities and supporting sustainable growth.

 

The Strategic Statement prioritises improving connectivity and network resilience. The A226 Galley Hill is identified in Local Transport Plan 5 (LTP5) as a key part of the local road network, with its restoration recognised as essential to reducing congestion, improving journey time reliability, and enabling the return of bus and Fastrack services along this corridor. Restoring the route directly contributes to the Council’s objectives to improve transport reliability, reduce pressure on the wider network, and enhance sustainable travel options.

 

Finally, restoring Galley Hill aligns with the Strategic Statement’s focus on supporting economic growth and quality of life. The closure has had a material impact on local businesses, access to employment, and journey times across the area. Reopening the route would unlock economic activity, support investment, and provide certainty to developers and employers, reflecting the Council’s ambition to put residents first while creating the conditions for long?term prosperity.

 

Financial Implications

 

KCC has submitted a Structures Fund bid for £45.3m, comprising of £40.8m funding from the DfT and £4.5m match funding. This scheme cost estimate includes substantial risk and contingency to protect against potential cost increases.

 

Ebbsfleet Development Corporation have committed a total of £1.5m match funding towards the scheme and will work in close partnership with KCC due to the importance of the scheme to Ebbsfleet. If successful, KCC will fund £3m towards the scheme. This funding is proposed to be funded from the Strategic Transport Infrastructure Fund and KCC Highway Capital Funding.

 

In accordance with the requirements of the fund, c£2m historic development costs have not been included within this match funding, or within the scheme costs. The £45.3m figure also does not include operational costs to make the cliff safe or legal costs. These costs have been sourced from existing budgets and reserves.

 

Should the bid to the Structures Fund be unsuccessful, KCC will continue to pursue potential external funding opportunities. Early-stage development and design work associated with capital projects may result in abortive costs. Where a scheme is not subsequently approved or funded, these costs cannot be capitalised and must be met from revenue budgets. If funding cannot be identified in the longer term and the scheme is not able to proceed, there is a possibility that scheme development costs to that date will be abortive, representing a revenue risk of approximately £160k. 

 

Legal Implications  

 

The A226 Galley Hill is a highway maintainable at public expense, and KCC is the highway authority for the route. As such, KCC is subject to the section 41 duty under the Highways Act 1980 to maintain the highway and keep it reasonably safe for ordinary use.

 

The collapse of the carriageway and footway in April 2023 meant that the A226 was no longer reasonably passable without danger requiring the authority to act to prevent danger to highway users. Although KCC are responsible for the highway on the cliff spine, at the time of the collapse the Council did not own the chalk cliff supporting the road.

 

Given the complexities around ownership of the spine and the planned legal proceeding against those deemed responsible for the collapse, legal support and advice has been ongoing since April 2023.

 

A full legal review of any proposed grant agreement will be undertaken prior to acceptance of grant funding to highlight and reduce risk to KCC.

 

 

Decision Maker: Cabinet Member for Highways and Transport

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Toby Howe

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00064 - Commissioning Plan for Education Provision in Kent 2027-31

Proposed decision: to agree the Commissioning Plan for Education Provision in Kent 2027-31 and agree to note the annual review of the SEND Sufficiency Plan.

 

Reason for Decision and Background

Kent County Council (KCC), as the Local Authority (LA), has a statutory duty to ensure sufficient school places are available. The County Council’s Commissioning Plan for Education Provision in Kent 2027-31 (KCP) is a five-year rolling plan which is updated annually. It sets out our future plans as Strategic Commissioner of Education Provision across all types and phases of education in Kent.

 

The Plan sets out how we will carry out our responsibility for ensuring there are sufficient high quality places, in the right locations for all learners, while at the same time fulfilling our other responsibilities to raise education standards and promote parental preference.  The Plan details the expected future need for education provision, thereby enabling parents and education providers to put forward proposals as to how these needs might best be met.

 

This Plan reflects the dynamic and ongoing process of ensuring there are sufficient places for Kent children in schools, and other provisions.  It is subject to regular discussion and consultation with schools, district/borough councils, KCC Elected Members, the diocesan authorities, and relevant others.  The content of this Plan reflects those discussions and consultations.

 

Options

The KCP sets out the principles by which we determine proposals, and it forecasts the need for future provision. It also sets out in more detail plans to meet the commissioning needs which arise in each district and borough in Kent during the next five years.

 

The KCP provides an overarching framework for determining when and where education may be needed in the future.  It sets out the forecast number of children and young people in Kent and breaks this down to smaller geographical areas (districts and planning groups) to show where there may be a need for more or fewer places.  It sets out the principles which will be used to consider and evaluate individual proposals which might come forward (be commissioned) to address any identified shortage or surplus of places in a locality. 

 

Each individual scheme that is brought forward will have a rigorous feasibility stage that is completed prior to the scheme formally being commissioned, through the appropriate democratic pathway.  An integral part of this process is to identify the most suitable option to provide the additional places.  Consideration is given to:

  • where the additional places would be best located from an education point of view
  • the physical capacity of the existing school sites and the practically of delivery (including geographical and Highways constraints).
  • providing the best value for money for the proposed scheme. 

 

The options considered will then be detailed in the Options section of the individual committee papers associated with each decision.

 

Local authorities in England are not legally required to publish a strategic school place planning document as a standalone statutory obligation. However, they do have a statutory duty under Section 14 of the Education Act 1996 to ensure that there are sufficient school places available for children of compulsory school age in their area.

 

While publication is not mandated by law, the Department for Education (DfE) strongly encourages local authorities to produce and share strategic school place planning documents. These are expected to include medium-term forecasts, rationale for expansions or contractions, and underpinning data. This is part of a broader framework for collaborative and transparent planning with academy trusts, dioceses, and the DfE’s Regions Group; the Kent Commissioning Plan achieves these aims and the option of not producing a strategic plan would not, it has therefore been rejected.

 

How the proposed decision supports the Council’s strategic statement

 

The KCP supports improved efficiency and timeliness in SEND services with plans to expand Specialist Resource Provisions (SRPs) and increase mainstream inclusion capacity.

 

Section 7 of the KCP: Commissioning Statutory School Provision by Districts, details district-level responses to housing growth and demographic pressures, seeking to ensure housing growth is sustainable.

 

The KCP supports value for money through Section 5: Capital Funding, which outlines the use of developer contributions, Basic Need funding, and cautious capital investment strategies. The plan also promotes in-house provision where financially viable and reducing reliance on independent placements.

 

Financial Implications

The LA as Strategic Commissioner of Education Provision has a key role in securing funding to provide sufficient education provision in the County, particularly in schools, in order to meet its statutory responsibilities.  The cost of delivering school places is currently met from Basic Need grant from the Government, prudential borrowing by the County Council, Section 106 property developer contributions and the Community Infrastructure Levy (CIL).  Government funding for ‘Basic Need’ is allocated on a formula based upon information provided by local authorities concerning forecast numbers of pupils and school capacity. The latest 2026-27 Basic Need Budget is £127 million. This includes confirmed grant funding from Government up to 2027-28 only. Future year Government grants are yet to be agreed.

 

The funding of Special Education Needs projects are fully met from the High Needs Capital grant, provided by Government and confirmed on an annual basis. The 2026-27 High Needs Programme Budget, is approximately £92.5m (including grant funding confirmed up to 2026-27). 

 

For both Basic Need and Special Education Needs programmes, individual projects are still subject to separate agreement via the appropriate governance process (including key decisions where applicable). The sufficiency plan sets out the anticipated school requirements to support future decision-making by the Council in meeting its duty to secure sufficient school places. The Education capital programme is continuously being reviewed, with projects entering and leaving the programme regularly in response to demand and project completions, therefore final decisions on individual projects will be subject to the financial position at the time, including future Government grant allocations and confirmed costings.

 

Legal Implications

Each project identified in the KCP will be subject to a separate consultation and decision-making process.  The legal implications of each proposal will be identified at that time. The general and relevant legal obligations includes ensuring there are “sufficient” school places (Education Act 1996), as far as possible, complying with the preferences expressed by parents (School Standards and Framework Act 1998), increasing opportunities for parental choice (Education and Inspections Act 2006, provide fair access to educational opportunity) (Education and Inspections Act 2006, keep its SEND provision under review and consider if it is sufficient to meet the needs of children and young people in its area (Children and Families Act 2014).

 

Pursuant to the Equality Act 2010, the Council must, in the exercise of its functions have due regard to the need to: ‘eliminate unlawful discrimination, harassment and victimisation and other conduct prohibited by the Act; advance equality of opportunity between people who share a protected characteristic and those who do not; foster good relations between people who share a protected characteristic and those who do not”. 

 

Decision Maker: Cabinet Member for Education and Skills

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Nick Abrahams

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00063 - Reallocation of Getting Building Funding

Proposed decision

 

That the Cabinet Member for Economic Development and Special Projects, agree to reallocate the Getting Building Funding (GBF), originally awarded to Tech Hub Flexible Workspace, Gravesend, to the A249 Bearsted Road Project.

 

Reason for the decision & background

 

Getting Building Funding (GBF) was announced by the Government in June 2020. The funding was part of the then Government’s plan to deliver upgrades to local infrastructure, boost skills, and help fuel an economic recovery by investing in shovel-ready housing and infrastructure projects, creating jobs and supporting economic recovery during the COVID-19 pandemic.

 

The previous Government decided that the South East Local Enterprise Partnership (SELEP) would allocate the funding with their approval. In total, the Government provided £85m of GBF to SELEP in 2020.

 

In summer 2023, SELEP announced that there was £2.05m of unallocated GBF available to bid for. Projects had to be shovel-ready capital projects which would deliver in 12 months. Business cases for Tech Hub Flexible Workspace and the A249 Bearsted Road Project were amongst those submitted for consideration.

 

SELEP Accountability Board met and considered the business cases submitted from across their area (Essex through to East Sussex).

 

On 12 January 2024, the SELEP Accountability Board agreed to

 

“the award of £370,000 GBF to Kent County Council for the Tech Hub Flexible Workspace, Gravesend, project which has been assessed as offering High value for money with a Medium/High certainty of achieving this, subject to receipt of Government approval of project inclusion within the GBF programme, and agree that the GBF funding can be retained against the project for a maximum period of 12 months to 31 January 2025.”

 

The GBF had to be spent in accordance with the business case, which is available here: Tech-Hub-Flex-Workspace-Gravesend.pdf

 

The A249 Bearsted Road project was not awarded funding, but was placed on SELEP’s reserve list of projects, were more GBF to become available.

 

Regular monitoring of the GBF programme is undertaken by KCC the Government.

 

In late 2024, the project promoter requested a project extension with GBF spend to be fully spent by 31 March 2025. This request was agreed by Central Government.

 

The revised deadline was not met, and a further extension to April 2026 was requested, which was also agreed.  In January 2026 the project promoter confirmed that the project was no longer deliverable and requested approval to pursue an alternative project that could be delivered within 12 months, achieving full spend of the GBF by March 2027.

 

Consequently, deliverability concerns and project risks were discussed by senior KCC officers (from GET and Finance Departments). Their recommendation to the Cabinet Member is to reallocate the funding to the A249 Bearsted Project, a project currently in delivery that is on SELEP’s original reserve list.

 

Following the dissolution of SELEP, KCC is the Accountable Body for the use of these funds.

 

The A249 Bearsted Road project is due to complete construction in February 2027, ensuring prompt spend of the grant funding.  It also aligns with the original aims of the GBF and the business case defined it as a very high value for money scheme. It will unlock development at the Kent Medical Campus Enterprise Zone; which is restricted to 75% build out without improved highway capacity (from the Bearsted Road scheme and M20 Junction 7). This is a key employment site for the county and will create 3,700 highly skilled jobs, including specialised research and development – an area key to boosting productivity. The reallocation of funding would also continue to benefit businesses and communities through investment in one of the original projects approved by central government. 

 

Options (other options considered but discarded)

 

If Kent County Council were to choose to not reallocate the funding to a project on SELEP’s reserve project list, the GBF would be returned to central government.

 

How the proposed decision supports  Reforming Kent 2025-2028: Kent County Council’s Strategic Statement

 

The award of GBF to the Bearsted Road project will support the aim of Building Better Communities through improving the quality of roads and providing infrastructure necessary to enable economic growth.

 

How the proposed decision supports Securing Kent’s Future: Securing Kents Future - Budget Recovery Strategy.pdf

 

The decision is compliant with the Strategic Statement in the context of the significant financial challenges that the Council is facing.

The A249 Bearsted Road Project is managed by KCC. The reallocation of funding towards this project will reduce potential cost pressures on KCC.

 

Decision Maker: Cabinet Member for Economic Development and Special Projects

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00062 - Contract CN260764 - Provision of Community Safety Accreditation Scheme (CSAS) Resource

Proposed decision

Award a 2+1-year contract for Community Safety Accreditation Scheme (CSAS) officers to manage traffic on Kent’s strategic and local road network, supporting KCC’s role as a Category 1 responder within the Kent and Medway Resilience Forum (KMRF).

 

Reason for the decision

 

CSAS-accredited officers are required to support KMRF’s Operation Fennel plans for managing traffic disruption at Kent’s ports.

 

The service was previously delivered through the Highways Term Maintenance Contract, which ended on 30 April 2026, and is now provided under contract CN260704.

 

CN260704 was directly awarded under an approved waiver for 12 months, with no extension, and expires on 30 April 2027.

 

A longer-term contract is needed to secure continuity and better value for money.

 

Background

 

Kent is the UK’s principal gateway to Europe, carrying nationally important freight routes while facing significant border and traffic pressures. KMRF manages road disruption through the Operation Fennel plans.

 

KCC works with Kent Police and National Highways to manage disruption caused by border delays. National Highways deploys Operation Brock on the M20 and the Dover Traffic Management Plan, but its traffic officers must also maintain wider network duties. Kent Police has limited traffic resources and is expected to focus officers on core policing duties.

 

KCC therefore provides trained, accredited CSAS officers to fill these operational gaps and support sustained delivery of Operation Fennel while border arrangements continue to change.

 

How the proposed decision supports the Council’s Strategic Statement

 

The CSAS service supports the Council’s priorities for resilient communities, connectivity and economic stability.

 

Operation Fennel reduces congestion and improves journey-time reliability during border disruption.

 

CSAS officers help limit the impact of congestion on residents, businesses, access to employment and Kent’s economic competitiveness while KCC continues to seek a long-term alternative to Operation Brock with Government.

 

 

Financial Implications

 

Annual demand will vary according to planned peaks, unplanned disruption and future changes to border systems, meaning that requirements cannot be forecast precisely.

 

Based on previous expenditure, the anticipated annual cost is approximately £750,000. However, the procurement sets a maximum contract value of £1 million per year to provide flexibility for higher deployment, inflation, budget changes, capital investment and changes to operational plans.

 

Accordingly, the advertised maximum contract value is £3 million over the full three-year term, comprising an initial two-year period with an optional one-year extension.

 

The service is currently funded by His Majesty’s Government through section 31 grants under the Local Government Act 2003. The funding position for the proposed contract is set out below.

 

Government funding for the full period of the proposed contract is expected but has not yet been guaranteed. The proposed cost over the three-year term is up to £3 million and is expected to be fully funded by Government grant. No contract will therefore be entered into, and no expenditure committed, until a funding agreement is in place and sufficient Government funding has been secured, ensuring that KCC is not exposed to financial risk. Use of the optional third year will also be dependent on confirmed funding availability

 

 

Legal Implications  

 

Legal Services is advising on the contract’s Local Government Reorganisation (LGR) clause so it can transfer to another body or a successor authority if required.

 

LGR will not alter local authorities’ Civil Contingencies Act duties. Successor councils will remain Category 1 responders responsible for emergency planning, risk assessment, business continuity, public information and multi-agency cooperation.

 

KMRF is expected to continue because Local Resilience Forums follow police-force boundaries. Local authority representation will transfer to the new unitary authorities.

 

KMRF and its plans, including Operation Fennel’s requirement for CSAS provision, are expected to remain in place.

 

Government’s Kent Resilience Strategy is considering longer-term alternatives to Operation Fennel. Until these are available, Government funding for existing plans, including CSAS officers, is expected to continue. The future recipient of that funding will be resolved through LGR discussions.

 

Decision Maker: Cabinet Member for Highways and Transport

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Toby Howe

Notice of decision: 19/10/2026

Anticipated restriction: Open


19/10/2026 - 26/00061 - Joint Transportation Board Future Arrangements

Proposed decision – Tocease current arrangements and delegate authority to develop and implement replacement engagement arrangements.

 

Reason for the decision

The existing Joint Transportation Board arrangements date from 2005 (5 districts) and 2021 (six districts). Based on mutual agreement there are no formal Joint Transportation Board arrangements with Maidstone Borough Council.  As such, there is no consistent or framework for engagement on local highways and transport matters. The decision is therefore required to cease the current arrangements and enable the development and implementation of a clearer, more efficient, effective and flexible replacement model, which maintains effective engagement with District and Borough Councils and can adapt to an evolving Local Government landscape.

 

Background

The operation and effectiveness of Joint Transportation Boards have previously been considered through reports to the KCC Scrutiny Committee. The Committee’s findings and recommendations included a review of the current arrangements. This work has informed the development of the proposed decision.

 

Options (other options considered but discarded)

-      Retain existing arrangements.

-      Cease/amend arrangements on a district-by-district basis.

 

How the proposed decision supports the Council’s Strategic Statement

The decision supports the Council’s Strategic Statement by promoting efficient use of resources, strengthening partnership working and establishing flexible engagement arrangements capable of adapting to Local Government Reorganisation.

 

Decision Maker: Cabinet Member for Highways and Transport

Decision due date: Not before 17/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Theresa Warford

Notice of decision: 19/10/2026

Anticipated restriction: Open


08/10/2026 - 26/00060 - Marmot Accelerator Programme 2026-2028

Proposed decision:

To approve the Marmot Accelerator Programme Framework for the period 2026-2028, including a total programme funding envelope of £1,000,000.

 

Background

 

On 13 March 2026, Kent County Council (KCC) launched as a Marmot Coastal Region – a long-term initiative aiming to reduce health inequalities and to improve the social determinants of health in coastal communities in Kent. The initial focus of the Kent Marmot Coastal Region Initiative is on skills for work and work. The following districts are included within the Initiative: Ashford, Canterbury, Dover, Folkestone & Hythe, Swale and Thanet.

 

The Marmot Accelerator Programme is a 2-year, Public Health reserves funded programme that will support the Marmot Coastal Region initiative. The Programme will adopt a test-and-learn approach, aiming to build and showcase effective, evidence-based methods of supporting Kent residents into employment, education or training. 

 

As part of the Marmot Coastal Region Launch, KCC announced three pledges the Marmot Accelerator Programme will achieve within 2026-2028: 

 

  • To support at least 200 young people, aged 16 to 24, into education and employment who would otherwise be part of the Not in Education, Employment or Training group (NEET).  
  • To support 150 people on probation into education and employment. 
  • To support 100 people with additional disadvantages such as care leavers, carers and people with mental ill health into work, based on the in-depth research completed as part of the Connect to Work scheme.    

 

A Record of Officer Decision (Decision No. OD-26-00033) was taken in September 2026, approving £586,300 of Public Health reserves for the initial delivery of the Marmot Accelerator Programme. This proposed decision seeks to establish a total Programme funding envelope of £1,000,000, comprising the funding already approved and an additional £413,700 from Public Health reserves.

 

Reason for the decision

 

The proposed decision is required to approve the Marmot Accelerator Programme framework, which will govern the allocation and management of the Programmes £1m funding and support delivery of the three pledges. 

The Framework will provide a transparent and consistent approach to the commissioning, funding and oversight of projects, ensuring that investment is aligned to the Programme's objectives and targeted towards priority groups.

Under this Framework all expenditure of the financial envelope for the Marmot Accelerator Programme must be in line with budget forecasting and Proposals for spend must adhere to the following criteria:

  1. Directly support residents within the Kent Marmot Coastal Region.
  2. Directly support residents from at least one of the priority population groups: young people who are or at risk of becoming NEET, people who are on probation and people experiencing additional barriers to employment, education and training.
  3. Focuses on employment, education and/or training practices and opportunities.
  4. Demonstrates alignment with relevant Kent-based strategies and policies.
  5. Evidence at least one ‘sustainable’ outcome, to demonstrate impact beyond the agreed funding term.
  6. Evaluates and publishes an end of Project report.

In addition, at least 50% of the Proposals funded as part of the Marmot Accelerator Programme will be delivered by local, Kent-based organisations and funding will be distributed across the Kent Coastal Region.

 

Options (other options considered but discarded)

 

Do nothing / defer action: Dismissed as this would not support the delivery of the launch pledges as part of the Marmot Coastal Region Initiative.

 

Deliver a single County-wide Service offer: Dismissed as the purpose of the Marmot Accelerator Programme is to test locally, tailored approaches across different coastal communities, to different population groups and provide funding opportunities to a range of Suppliers.

 

Deliver all funding through one procurement route: Dismissed as a blended approach of Direct Awards, RFQs and Competitive Grant Awards provides greater flexibility, encourages innovation, supports local organisations and maximises value for money.

 

Deliver projects outside of the Framework: Dismissed as the Framework will provide an equitable and transparent approach to how the funding will be spent, and ensures a consistency in reviewing Proposals and approving funding.

 

How the proposed decision supports the Council’s Strategic Statement

The Marmot Accelerator Programme supports KCC to achieve the following objectives set out within the Reforming Kent Strategic Statement 2025-2028 via the Programme delivery:

  • Putting Kent residents first: by ensuring the voices of residents with lived experience and local organisations are embedded within the Programme and encouraging local businesses to create job opportunities for Kent residents.
  • Reforming Kent County Council: by ensuring the Programme is cost-efficient, whilst enabling high-quality, innovative test-and-learn approaches.
  • Supporting residents that need help: by ensuring the Programme supports priority population groups outlined in the launch pledges, and funds innovative, test-and-learn approaches that focus on prevention and early intervention.
  • Building better communities: by the Programme prioritising addressing coastal inequalities, with ‘Marmot’ model intervention work being explicitly stated within the Strategic Statement.

 

Decision Maker: Cabinet Member for Environment, Coastal Regeneration and Public Health

Decision due date: Not before 06/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Emily Rutland

Notice of decision: 08/10/2026

Anticipated restriction: Open


08/10/2026 - 26/00052 - Kent County Council (KCC) Energy Strategy

Proposed decision –To approve KCC’s new energy strategy

 

Reason for the decision

 

-      Kent County Council’s (KCC) Energy Strategy  sets out the key energy challenges facing Kent and the ways in which KCC will work to support the county’s residents and businesses to benefit from the energy transition through access to reliable, affordable and clean energy. It builds on KCC’s 2026 Position Statement on Solar Generation.

-      The strategy assesses Kent’s current and future strategic energy needs and how KCC will work to ensure that these are met in the context of volatile energy prices, high energy bills for Kent’s residents and businesses, and the need to adapt to a changing climate.

-      This strategy complements the Kent and Medway Energy and Low Emissions Strategy (ELES) which aims to improve energy efficiency and reduce emissions across the KCC estate and Kent’s businesses and communities. However, this strategy specifically sets out  KCC’s approach to energy generation within the wider national and international context of accelerating electrification of heating, transport and industry, and the need to increase independence from volatile international fossil fuel markets.

-      The strategy supports the Kent and Medway Economic Framework’s (KMEF) goals of enabling sufficient energy provision to support Kent businesses’ power needs, decarbonising our energy and transport systems, and implementing more energy efficient methods of production. It is informed by the emerging Kent and Medway Local Growth Plan – where energy is one of four priority sectors where Kent and Medway has nationally significant strengths and growth opportunities.

 

Background

 

-      The post-Covid pandemic surge in demand for oil and gas, followed by Russia’s 2022 invasion of Ukraine, triggered European gas prices to soar by more than 200% in 2021.  The war sent shockwaves through the global economy and disrupted energy markets on an unprecedented scale.  Energy prices are still way above pre-pandemic levels and this has led to painful increases in the cost of living in the UK. The Europe wide energy-system transformation that it triggered has led to accelerating diversification and renewable deployment nationally and in Kent.

-      Kent County Council’s vision is to secure a resilient energy system that meets Kent’s current and future economic and housing growth needs and reduces reliance on volatile international energy markets. The Council will take a proactive leadership role in shaping Kent’s future energy system, and wherever we can the national and regional energy systems, to ensure that the right energy infrastructure is deployed in the right places, ahead of need.

-      KCC will commit to working with Government, industry and partners to unlock investment, address infrastructure constraints and ensure Kent is fully prepared to shape and benefit from Regional Energy Strategic Plans (RESPs), securing a sustainable and competitive energy future for the county.

 

-      KCC’s work will focus on the following priorities:

 

o   Community Energy

o   Heat networks

o   Solar generation

o   Nuclear generation

o   Dungeness Decommissioning Academy and Nuclear Skills Campus

o   Hydrogen production

o   Household generation and storage

o   Data centres

o   Port of Dover

o   Grid constraints

 

-      Central government, network operators and the private sector are the main actors responsible for the deployment of energy generation infrastructure nationally. Participation in the Southeast RESP is the key mechanism by which KCC can work with central government, network companies and private developers to influence decisions around the generation mix in Kent and the siting of new energy infrastructure to ensure that these meet the needs of Kent’s residents and businesses. KCC’s Strategic Planning and Infrastructure Team will work across the Growth Environment and Transport directorate to identify Kent’s current and future energy priorities in preparation for the 2028 RESP.

 

-      The County Council administration’s preferred approach to solar generation is set out in KCC’s Position Statement on Solar Developments (2026). It is expected that renewed nuclear generation at Dungeness (and elsewhere as small modular reactor technologies mature and deployment accelerates) should play a role in meeting the county’s energy requirements without the need for extensive solar arrays on farmland.

 

-      Research carried out by the Department for Business, Energy and Industrial Strategy (BEIS) in 2021 suggests 250-460TWh of hydrogen could be needed in 2050, making up 20-35 per cent of UK final energy consumption. The Energy strategy will consider how Kent can attract and support hydrogen generation projects in the county as an important fuel in the energy transition and for the wider employment and economic benefits that generation facilities in the county could bring.

 

Options (other options considered but discarded)

 

-      Continue without an energy strategy

 

How the proposed decision supports the Council’s Strategic Statement

 

The proposed decision supports KCC’s Strategic Statement, Reforming Kent 2025–2028, by helping to secure the long-term infrastructure needed for Kent’s residents, communities and businesses to thrive.

 

  • Building Better Communities — the strategy supports strategic infrastructure, energy resilience, economic growth, and preparation for future housing and business energy needs.
  • Putting Kent Residents First — supports reliable, affordable and clean energy, reducing exposure to volatile energy markets, and supporting residents and businesses.
  • Financial sustainability / value for money — energy resilience, supports economic growth and reduces long-term risk.

 

In particular, the strategy aligns with the Strategic Statement by promoting Dungeness as a nationally significant location for future nuclear generation and skills development; supporting appropriate renewable and low-carbon energy opportunities; protecting Kent’s agricultural land and local communities from inappropriate large-scale solar development; and supporting the infrastructure needed for a stronger, cleaner and more competitive Kent economy.

 

 

 

Decision Maker: Cabinet Member for Economic Development and Special Projects

Decision due date: Not before 06/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Tom Henderson

Notice of decision: 08/10/2026

Anticipated restriction: Open


08/10/2026 - 26/00050 - Adoption of the Kent and Medway Local Growth Plan

Proposed decision:

 

To approve the Kent and Medway Local Growth Plan as a long-term, evidence-led, sector-focused growth plan for Kent and Medway and to support its use in informing future economic and sector development activity, investment opportunities and engagement with Government, businesses and partners.

 

The decision will enable Kent County Council, through its role within the Kent and Medway Economic Partnership (KMEP), to formally support the adoption of the Local Growth Plan and the continued development of associated investment propositions and delivery activity

 

Reason for the decision

 

-      The Government's English Devolution White Paper introduced Local Growth Plans as a mechanism for supporting place-based economic growth and investment.

 

-      Whilst Kent and Medway are not currently required to produce a Local Growth Plan as a non-devolved area, KMEP has chosen to develop one proactively to ensure Kent and Medway is well positioned to support future engagement with Government and investors and to articulate the area's economic strengths, opportunities and priorities.

 

-      The proposed decision is required to enable formal adoption of the Local Growth Plan and to support its use in future economic development, partnership and investment activity across Kent and Medway.

 

Background

 

-      The Kent and Medway Local Growth Plan is being developed through the Kent and Medway Economic Partnership (KMEP), supported by Kent County Council, Medway Council, businesses, education providers and wider economic partners.

 

-      To support development of the Plan, KCC commissioned an independent evidence base and stakeholder engagement programme. This identified four priority sectors where Kent and Medway has nationally significant strengths and growth opportunities:

·   Agri-food and Agri-tech

·   Ports, Transport and Logistics

·   Digital and Technologies

·   Energy.

 

-      The evidence base and stakeholder engagement also identified a number of cross-cutting growth priorities which affect multiple sectors and places across Kent and Medway, including:

·   Innovation

·   Infrastructure

·   Skills

·   SME growth

·   Improved connectivity and collaboration across sectors, organisations and places.

 

-      The Local Growth Plan has been informed by engagement with businesses, education providers, local authorities and economic partners through a programme of workshops and stakeholder engagement activities. This has informed development of the Plan and the emerging investment pipeline.

 

-      The Local Growth Plan complements and builds on the Kent and Medway Economic Framework, Local Skills Improvement Plan and Get Kent & Medway Working Plan by identifying priority sectors and future labour market demand, growth opportunities and potential investment propositions that support Kent and Medway's wider economic ambitions.

 

-      Further stakeholder engagement is planned before the Local Growth Plan is finalised, including engagement with thematic leads and wider stakeholders to refine actions, priorities and investment propositions.

 

Options

Option 1: Do not formally adopt the Local Growth Plan (Do nothing) (Not recommended)

 

-      This would reduce Kent and Medway's ability to present a consistent, evidence-led approach to economic growth and investment and would limit opportunities to support future engagement with Government, investors and partners.

 

Implications:

-      No agreed Local Growth Plan for Kent and Medway.

-      Reduced ability to articulate Kent and Medway's economic priorities and growth opportunities through a single evidence-led plan.

-      Reduced ability to support future engagement with Government, investors and funding opportunities.

-      Missed opportunity to build on the evidence base and stakeholder engagement undertaken to date.

 

Option 2: Delay Adoption Until Further Development Work Is Complete (Not recommended)

-      Delay approval until actions and investment propositions have been further developed. This would delay adoption of the overall growth plan and reduce the ability to utilise the Plan during future engagement and economic development activity.

 

Implications:

-      Delays formal adoption of the Local Growth Plan. 

-      Delays use of the Plan to support engagement with Government, investors and partners.

-      Additional stakeholder engagement and refinement work would continue before adoption of the Plan.

-      Potential risk of losing momentum generated through the evidence base and stakeholder engagement process.

 

Option 3: Adopt the Local Growth Plan (Recommended)

-      Approve the Local Growth Plan as a long-term, evidence-led growth plan for Kent and Medway, whilst recognising that future projects, investment propositions and delivery activity may require separate governance approvals where appropriate.

 

Implications:

-      Provides an agreed evidence-led growth plan for Kent and Medway.

-      Supports future engagement with Government, investors, businesses and partners.

-      Provides a framework for future development of investment propositions and partnership activity.

-      Enables continued refinement of actions and investment opportunities through future stakeholder engagement and implementation activity.

-      Any future projects, funding proposals or investment opportunities arising from the Plan will be subject to separate governance and approval processes where required.

 

How the proposed decision supports the Council’s Strategic Statement

 

-      The proposal aligns strongly with the four aims of Kent County Council’s strategic statement:

 

Putting Kent Residents First

-      The Local Growth Plan supports sustainable economic growth across Kent and Medway by identifying opportunities to improve productivity, attract investment, support business growth, create employment opportunities and develop the skills required for Kent and Medway's future economy.

 

Reforming Kent County Council

-      The Local Growth Plan provides an evidence-led framework to support partnership working across Kent and Medway and helps align economic development activity around shared priorities.

-      The Plan supports a coordinated approach to economic growth and investment, helping partners work together to maximise opportunities for Kent and Medway.

 

Supporting Residents That Need Help

-      Through its focus on employment, skills and economic participation, the Plan seeks to support opportunities for residents to access good quality employment and skills development as well as providing clarity about growing demand-side labour market opportunities.

-      The Plan promotes inclusive economic growth and recognises the importance of ensuring that the benefits of growth are felt across communities and places throughout Kent and Medway.

 

Building Better Communities

-      The Local Growth Plan supports the long-term resilience, prosperity and competitiveness of communities across Kent and Medway.

-      By promoting business growth, investment, innovation, skills development and supporting infrastructure, the Plan seeks to strengthen local economies and support thriving places in which people can live and work.

 

Additional Contribution

-      The Local Growth Plan will support engagement with Government, investors, businesses and partners by providing a clear evidence-based articulation of Kent and Medway's economic strengths, opportunities and priorities, while supporting the continued development of investment propositions and partnership activity.

 

Decision Maker: Cabinet Member for Economic Development and Special Projects

Decision due date: Not before 06/11/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Steve Samson

Notice of decision: 08/10/2026

Anticipated restriction: Open


21/04/2026 - 26/00023 - Services covering Appropriate Adults, Advocacy, Independent Visitors, Independent Persons, Accompanying Adults and Care Leaver Mentoring - Commissioning a new service

Proposed Decision:

To commission, via an external provider, Independent Advocacy, Independent Visitors, Independent Persons, Accompanying Adults, Appropriate Adults and Leaving Care Mentoring services to support children and young people.

 

Reason for decision:

 

The current service, called Representation, Rights and Advocacy (RRA), is commissioned via an external provider due to the need to have provision independent of the Local Authority. Having used all allowable extensions, the current contract ends in September 2027. This service is required to allow Kent County Council to meet its statutory obligations.

 

The current service has several service elements:

 

  • Appropriate Adults - Service for young people aged 10 - 17 years and vulnerable adultsdetained at police custody suites who require support.
  • Advocacy - Advocacy for Children in Care and for Care Leavers aged 16 – 24. (Must be delivered independently from the Local Authority).
  • Independent visitors (IV) -For Children in Care aged 8 – 18 years.
  • Independent Person- For Stage 2 complaints. (Must be delivered independently from the Local Authority).
  • Accompanying Adults - For the purpose of age assessment interviews for unaccompanied asylum-seeking children (UASC).(Best practice suggests independence from the Local Authority).

·   Leaving Care Mentoring – The provision of mentoring for care leavers aged 18–25 who are transitioning to independent living. 

 

The proposal is to commission an externally delivered service with the six elements together with one provider covering the county.

 

Using the current cost of the service, £258,800 per annum, for a contract for four years with two, two year extensions would mean that the total value of the contract exceeds £1m and impacts more than two electoral divisions.

 

Background:

·       Local authorities have statutory duties that underpin the elements of the these services. 

·       This proposal seeks approval to commission a new service that covers all of these elements for an initial term of four years (with two, two year extensions) following a compliant procurement .

·       Commissioning activity includes developing the Specification with professional stakeholders and children and young people.

 

Options  

In any commissioning activity, the options considered include

1.  Do nothing – KCC would fail to meet its statutory obligations

2.  Creating a new in-house model – Would not meet requirements of some elements to be independent from the Local Authority

3.  Externally commissioning a new service – Would meet statutory requirements for provision

 

These will be explored in more detail for the Recommendation Report.

 

Links to the Council’s Strategic Statement

This proposal aligns with Reforming Kent, 2025-2028; Aim three of Reforming Kent “Supporting residents that need help.”

 

The proposed service will support and empower young people to make informed choices about their care and to feel safe throughout their care journey. It will provide consistent, rights?based support during the custody process and throughout any age assessment, ensuring young people understand what is happening, can express their views, and are actively involved in decisions that affect them.

 

Financial Implications:

This service is currently budgeted from the Council’s General Fund. Spend is reported within the revenue budget against the Key service line Children in Need – Care and Support (payments and commissioned services).

 

The current cost of the service is £258,800 per annum which has been held for many years. We are expecting a price negotiation at the point of the agreed extension in September 2026.

 

Financial modelling is currently being undertaken and will be available at the point of Decision. This is to understand the impact of holding the price of the current contract to todays values along with a model of delivery consistent with market feedback.

 

The new proposal seeks a contract term of four years with two, two year extensions.

 

Legal Implications:

As this service has six elements, the legal basis differs, as follows:

 

 

Service Element

Statutory obligation

Appropriate Adults

Police and Criminal Evidence Act 1984 (PACE) and its Code of Practice C.

Accompanying Adults

Case law – including B v Merton, FZ v Croydon, together with Home Office policy, establishes that a supportive adult is required as best practice to ensure procedural fairness and achieve a Merton?compliant age assessment.

Independent Visitors

Children Act 1989, ss.23zb

Advocacy

Adoption and Children Act 2002, ss.26a

Independent Persons

Children Act 1989, ss.24d and 26

Leaving Care Mentoring

A non-statutory element that helps children in care prepare for adulthood and directly address the improvement area highlighted by Ofsted in The 2025 Ofsted Children’s Services Review, by strengthening the support available to care leavers.

 

 

The procurement of the services will be conducted in compliance with the Procurement Act 2023.

 

Decision Maker: Cabinet Member for Integrated Children's Services

Decision due date: Not before 20/05/2026 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Christy Holden

Notice of decision: 21/04/2026

Anticipated restriction: Open


21/10/2025 - 25/00087 - Proposal to permanently increase the formal designated number of Broomhill Bank School, Broomhill Road, Royal Tunbridge Wells, Tunbridge Wells, TN3 0TB, from 318 students to 490 students

Proposed decision –The Cabinet Member for Education and Skills:

 

  1. APPROVE the increase of Broomhill Bank School’s designated number from 318 students to 490 students

 

  1. AGREE to allocate the funding from the Children Young People and Education Services High Needs Capital Budget that will be required to complete the expansion

 

  1. AGREE to issue a Public Notice to permanently increase Broomhill Bank School’s formal designated numbers following a representation period of four weeks with no substantive objections received, implement the decision

 

  1. DELEGATE authority to the Director of Infrastructure, in consultation with the Head of Law and Director of Education to enter into any necessary contracts or other legal agreements as required to implement the decision; and

 

  1. AGREE for the Director of Infrastructure, to be the nominated Authority Representative within the relevant agreements and to enter into variations as envisaged under the contracts.

 

Reason for the decision

 

Kent County Council (KCC) as the Local Authority, has a statutory duty to ensure sufficient high quality school places are available, in the right places for all learners, while at the same time fulfilling our other responsibilities to raise education standards and promote parental preference. The Kent Commissioning Plan 2025-2029 indicated that there will be a shortfall in Special School provision in North and West Kent. Even though KCC’s direction of travel is to increase Special Educational Needs (SEN) provision in mainstream schools and associated Specialist Resource Provisions (SRPs), due to already identified shortfalls and anticipated population growth in certain areas of North and West Kent, more specialist provision is required for children and young people with more complex needs.

 

KCC SEN Data for North Kent as at April 2025, evidenced that there were 237 children and young people waiting for a Special School placement, and 243 open cases, of which was anticipated that a large number would require a Special School placement. For West Kent as at April 2025, there were 201 children and young people awaiting a Special School placement, with 207 open cases.

 

In July 2023 KCC was informed that it had been successful in bidding for a new 250 place Profound, Severe, and Complex Needs (PSCN) Special School in North Kent (Swanley). The school had an initial target opening date of September 2026 and was to be funded and built by the Department for Education (DfE). However, for a number of reasons progress has been incredibly slow and there are now concerns that the school may not progress any further. Even if it were to continue, that school would not be built until 2028 at the very earliest and as the data shows, provision is required now. KCC Officers and the Cabinet Member for Education and Skills continue to push the DfE and Ministers for confirmation of the status of the proposed new Swanley Special School.

 

The proposal to permanently increase the formal designated number of the Broomhill Bank School from 318 students to 490 students, will require new teaching spaces and enhancements to existing infrastructure on both school sites in Tunbridge Wells and Hextable.

 

If no further action is taken in the longer term, KCC will find it extremely difficult to provide sufficient state-funded Special School provision in North and West Kent.

 

Background – Provide brief additional context

 

Broomhill Bank School is a Foundation Special School and a member of Kent Special Educational Needs Trust (KsENT), catering for students aged 11-19 years who have communication and interaction needs associated with Autism and speech, language, and communication needs. All students have Education, Health, and Care Plans. Following an inspection that took place in October 2023, Ofsted deemed Broomhill Bank School to be a ‘GOOD’ school.

 

Due to delays regarding the proposed new PSCN School, the numbers of students in North Kent still requiring specialist provision at this time, and the fact that all Special Schools in the locality are already over capacity; this is unsustainable in the short and medium term, and if not addressed will lead to further places in the independent sector. There is a clear need for further expansion of state-funded specialist provision, where appropriate, to secure the current number of places on a permanent basis alongside the expansion of SRPs and mainstream inclusion.

 

Options (other options considered but discarded)

 

KCC has considered whether other Special Schools in the North and West Kent areas are viable candidates for a permanent increase to their formal designated numbers. There is also a proposal to expand Parkwood Hall Co-operative Academy, but this alone will not produce sufficient places to meet current demand, as that expansion primarily relates to additional places for Primary age children. Therefore, Broomhill Bank School is the most appropriate and viable option to also increase its designated number.

 

By increasing their formal designated number through the physical expansion of Broomhill Bank School, which is KCC maintained provision, it protects the Local Authority from increased revenue costs. The proposal will help to mitigate against the need to place students further away from home and incurring additional transport costs, alongside incurring increased costs from placing a greater number of children in high-cost independent settings to alleviate the current pressures in KCC state-funded Special Schools in the area.

 

How the proposed decision supports the Framing Kent's Future - Our Council Strategy 2022-2026

 

The 'Securing Kent's Future' strategy outlines the measures that KCC intend to take to ensure that Kent remains financially stable, now, and long into the future. It describes the statutory priorities.

 

This proposed decision supports Priority 1 of Framing Kent’s Future-Our Council Strategy 2022-2026:

·         Priority 1: Levelling Up Kent – It will help maintain KCC’s strategic role in supporting schools in Kent to deliver accessible, high quality education provision for all families.

 

How the proposed decision supports Securing Kent’s Future 2022-2026: Securing Kents Future - Budget Recovery Strategy.pdf

 

This proposed decision is compliant with Objective 1 of Securing Kent’s Future, KCC as the LA proposes to expand Broomhill Bank School.This proposal is necessary for KCC to continue to deliver the statutory duty, in a cost-effective way, in line with the guidelines described in the Securing Kent's Future 2022-2026 strategy.

 

The proposed new Strategic Statement will be presented to Full Council on 6 November 2025 and considered for adoption. As this FED was drafted prior to that date, it aligns with the relevant policies at the time. Even though the Cabinet Committee Paper will be published after 6 November 2025 Full Council meeting, it will have been drafted prior to the adoption of a new Strategic Statement and so will also refer to Securing Kent’s Future 2022-2026.

 

Financial Implications

 

Progression of the scheme will be dependent on the outcome of detailed feasibility and design work – these will inform the full overall cost of the scheme, at which point the formal decision will be taken by the Cabinet Member for Education and Skills. The project will be a school managed scheme and will be confirmed via legally binding funding and development agreements between KCC and Broomhill Bank School. The costs of the two new blocks on the North (Hextable) site, and upgrades and modifications across both the North (Hextable) site and West (Tunbridge Well) site will be borne by the CYPE High Needs Capital Budget. This is funded from a ring-fenced Capital Grant from the DfE. From initial feasibility studies, the estimated cost for the whole scheme was £4,000,000.

 

However, after initial feedback from KCC Planning and Highways colleagues, there is a possibility that costs may increase, primarily due to the need for additional Highways mitigations around the Broomhill Bank School North (Hextable) site. Therefore, we will not be requesting the formal decision to be taken until such time that planning is concluded, and the full extent of the cost of the scheme is known.The latest estimates indicate the costs could increase to as much as c£5.5m, but much work still needs to be undertaken with Planners and Highways to determine the extent of the mitigations required.

 

For Special School capital projects, the average cost per student place for a school expansion in Kent is c£85,000. However, even if this scheme were to produce only the teaching accommodation for 105 students the higher estimated cost equates to a cost per place of c£52,000, which still demonstrates good value for money.

 

KCC Project Managers will be undertaking continuous checks to keep project costs as low as possible.

 

An allowance of up to £2,500 per teaching space may be payable to Broomhill Bank School; to outfit each new teaching room with appropriate ICT equipment, such as touch screens or projection equipment. This will be met from the overall Capital allocation for this scheme.

 

The High Needs Capital Programme has been running since 2020-21 with a total combined budget of just under £109m of which £67m has been either spent or committed to current known schemes (as at Quarter 1 2025 capital monitoring reported to Cabinet in September 2025). In the same way as the Basic Need programme is managed, to ensure all schemes are prioritised appropriately and expenditure is controlled within available funding, any proposed new or additional capital expenditure, first needs to be considered by KCC Officers through Education Asset Board, before being progressed through the formal governance processes and included in the capital programme.

 

Should the scheme not proceed through to completion, any costs incurred at the time of cessation would become abortive costs and are likely to be recharged to Revenue. This would be reported through the regular financial monitoring reports to Cabinet. This would be a cost to the General Fund.

 

As the scheme progresses, £8,000 per newly provided learning space, would be provided towards the cost of furniture and equipment, such as tables, desks, chairs, cabinets and learning resources. This would be funded from the Dedicated Schools Grant Growth Fund.

 

State funded Special School places are commissioned by Local Authorities and paid based on a rate per place. The rate per place set by KCC for Broomhill Bank School is currently between £15,041 to £24,946 dependant on need type. The higher rate for Broomhill Bank School is approximately £35,000 less than a place in an independent Special School. Local Authorities use the High Needs Block of the Dedicated Schools Grant to pay for these places. Broomhill Bank School will use the revenue income they receive to facilitate additional staffing requirements and increased running costs.

 

Legal Implications

 

Under the Children and Families Act 2014 KCC has a duty ‘to support the child and his or her parent, or the young person, in order to facilitate the development of the child or young person and to help him or her achieve the best possible educational and other outcomes’. By ensuring we have appropriate provision as locally as possible, we are delivering on our obligation in accordance with this legislation.

 

Local Authorities need to deliver their statutory duties and be aware of non-statutory guidance and advice, which relate to children and young people with SEN. These are:

·       Department for Education-Making significant changes to maintained schools 2025: statutory guidance for proposers and decision makers.

·       The Equalities Act which: places duties on Local Authorities to review support services and in doing so requires Local Authorities to have due regard to the way in which any changes will affect children and young people with a disability.

·       The SEND Code of Practice places requirements on Local Authorities to: provide access to advice from a suitably qualified person as part of the EHCP process and subsequent “assess, plan, do, review” cycles, and make appropriate provision for those with an EHC plan in the 0-25 range.

·       Sufficiency Duties: KCC is under a statutory duty to contribute towards the spiritual, moral, mental, and physical development of the community by securing that efficient primary education and secondary education are available to meet the needs of the population of their area: section 13 of the Education Act 1996 (“the 1996 Act”).

·       KCC must ensure that its education functions are exercised by the authority with a view to promoting high standards, ensuring fair access to opportunity for education and training, and promoting the fulfilment of learning potential by every person under the age of 20 and those over the age of 20 and for whom an EHC Plan is maintained: section 13A. By section 14, KCC must secure that sufficient schools for providing primary and secondary education are available for their area, defined as being sufficient in number, character and equipment to provide for all students the opportunity of appropriate education.

·       Under section 27 of the Children and Families Act 2014 (“the 2014 Act”), KCC is under a duty to keep under review the educational provision, training provision and social care provision made in its area (and outside it) for children and young people who have special educational needs or a disability. KCC must consider the extent to which its provision is sufficient to meet the educational needs, training needs and social care needs of the children and young people concerned.

·         KCC, when carrying out its functions must have “due regard” to the provisions of section 149 of the Equality Act 2010, known as the ‘public sector equality duty’.

 

All individual proposals to either establish new, expand current or cease current provision are required to go through the statutory process under The School Organisation (Prescribed Alterations to Maintained Schools) (England) (Amendment) Regulations, 2025. As part of this process, a public consultation was undertaken ahead of presentation of the proposal to CYPE Cabinet Committee. Should the Cabinet Member for Education and Skills agree to the permanently increase to the formal designated number of the Broomhill Bank School from 318 students to 490 students, through a permanent expansion, a Public Notice will be issued for a period of 4 weeks.

 

The Director of Infrastructure in consultation with the Director of Education will be overseeing the scheme to ensure public funds are utilised appropriately.

 

Decision Maker: Cabinet Member for Education and Skills

Decision due date: Not before 19/11/2025 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Ian Watts

Notice of decision: 21/10/2025

Anticipated restriction: Open


21/10/2025 - 25/00086 - Proposal to facilitate the expansion of Parkwood Hall Co-operative Academy, Beechenlea Lane, Swanley, Kent, BR8 8DR

Proposed decision –The Cabinet Member for Education and Skills:

 

  1. APPROVE the requisite funding from the Children Young People and Education High Needs Capital Programme that will be required to increase Parkwood Hall Co-operative Academy’s designated number from 120 to 192 students

 

  1. DELEGATE authority to the Director of Infrastructure, in consultation with the Head of Law and Director of Education to enter into any necessary contracts or other legal agreements as required to implement the decision; and

 

  1. AGREE for the Director of Infrastructure, to be the nominated Authority Representative within the relevant agreements and to enter into variations as envisaged under the contracts.

 

Reason for the decision

 

Kent County Council (KCC) as a Local Authority, has a statutory duty to ensure sufficient high quality school places are available, in the right places for all learners, while at the same time fulfilling our other responsibilities to raise education standards and promote parental preference. The Kent Commissioning Plan 2025-2029 indicated that there will be a shortfall in Special School provision in North Kent. Even though KCC’s direction of travel is to increase Special Educational Needs (SEN) provision in mainstream schools and associated Specialist Resource Provisions (SRPs), due to already identified shortfalls and anticipated population growth in certain areas of North Kent, more specialist provision is required for children and young people with more complex needs.

 

KCC SEN Data for North Kent as at April 2025, evidenced that there were 237 children and young people waiting for a Special School placement, and 243 open cases, of which was anticipated that a large number would require a Special School placement.

 

In July 2023 KCC was informed that it had been successful in bidding for a new 250 place Profound, Severe, and Complex Needs (PSCN) Special School in North Kent (Swanley). The school had an initial target opening date of September 2026 and was to be funded and built by the Department for Education (DfE). However, for a number of reasons progress has been incredibly slow and there are now concerns that the school may not progress any further. Even if it were to continue, that school would not be built until 2028 at the very earliest and as the data shows, provision is required now. KCC Officers and the Cabinet Member for Education and Skills continue to push the DfE and Ministers for confirmation of the status of the proposed new Swanley Special School.

 

The proposal to facilitate the expansion of Parkwood Hall Co-operative Academy will create 48 places of additional primary provision (Reception to Year 6) plus additional places for secondary aged pupils. The building project for this expansion will be managed by Parkwood Hall Co-operative Academy, while KCC Infrastructure will oversee the scheme from a quality assurance perspective.

 

If no further action is taken in the longer term, KCC will find it extremely difficult to provide sufficient state-funded Special School provision in North Kent.

 

Background – Provide brief additional context

 

Parkwood Hall Co-operative Academy is a Single Academy Trust and officially sits under the

Royal Borough of Kensington and Chelsea (RBKC) but is located in Swanley Kent. KCC is the

main placing authority with the school. Parkwood HallCo-operative Academy is a Special

School for children and people aged 8-19 (Year 4 to Year 14) who have moderate to severe

learning difficulties and Autism. Many of the students have additional needs including ADHD,

Downs Syndrome and language difficulties. All students have Education, Health and Care

Plans. Following an inspection that took place in July 2025, Ofsted deemed Parkwood Hall Co-

operative Academy to be a ‘GOOD’ in 4 out of the 5 areas, and ‘OUTSTANDING’ in the area of

Behaviours an Attitudes.

 

The Principal of Parkwood Hall Co-operative Academy is already admitting students over and

above the designated number. Currently the number of students on roll is 135. Parkwood Hall Co-operative Academy continues to admit students with more complex needs, whilst ensuring the quality of education for all students is maintained.

 

Due to the school’s location RBKC now has limited interaction with the school and places a

very limited number of children and young people there. KCC continues to be one of the main

placing authorities with Parkwood Hall Co-operative Academy, placing 61 students out of a total school roll of 136 for the 2024/2025 academic year. For the start of this current academic year, 2025/2026, the school has 65 students placed by Kent out of a total school roll of 135 with no students placed from RBKC.

                       

KCC has formed strong working relationships with the Senior Leadership of Parkwood Hall Co-

operative Academy, and the school has indicated its very clear desire to be recognised as part

of the Special Educational Needs (SEN) system in Kent. Parkwood Hall Co-operative Academy

has acknowledged the need for more specialist placements for children with complex needs

predominantly across the primary age groups, and has therefore proposed to expand its age

range from what is currently 8- to 19-year-olds (Year 4 to Year 14) to 4-to-19-year olds

(Reception to Year 14) to support need in the North Kent area.

 

North Kent is still encountering significant growth primarily in Dartford, but the other two districts

of Gravesham and Sevenoaks are fast approaching completion of their new Local Plans, which

will see significant housebuilding required for the period up to 2040 and beyond.

 

Due to delays regarding the proposed new PSCN School, the numbers of students in North

Kent still requiring specialist provision at this time, and the fact that all Special Schools in the

locality are already over capacity, there is a clear need for further expansion of state-funded

specialist provision to ensure the current number of places can be maintained on a permanent

basis.             

 

This proposal is part of a plan to help alleviate current pressures and help mitigate future

population growth across the wider North Kent area, alongside the expansion of SRPs and

mainstream inclusion.

 

Options (other options considered but discarded)

 

KCC has considered whether other Special Schools in the North Kent area are viable candidates for a permanent increase to their formal designated numbers. There is also a proposal to expand Broomhill Bank School, but this alone will not produce sufficient places to meet current demand, as that expansion primarily relates to additional places for secondary age children. Therefore, Parkwood Hall Co-operative Academy is the most appropriate and viable option to also increase its designated number. It is however, recognised there is no guarantee these places will be offered to Kent children, and we have no statutory intervention powers to secure these placements. Although this has been considered an acceptable risk.

        

By increasing their formal designated number through the physical expansion of Parkwood Hall Co-operative Academy, which is a state-funded provision, it protects the Local Authority from increased revenue costs. The proposal will help to mitigate against the need to place students further away from home and incurring additional transport costs, alongside incurring increased costs from placing a greater number of children in high-cost independent settings to alleviate the current pressures in KCC state-funded Special Schools in the area.

 

How the proposed decision supports the Framing Kent's Future - Our Council Strategy 2022-2026

 

The 'Securing Kent's Future' strategy outlines the measures that KCC intend to take to ensure that Kent remains financially stable, now, and long into the future. It describes the statutory priorities.

 

This proposed decision supports Priority 1 of Framing Kent’s Future-Our Council Strategy 2022-2026:

·         Priority 1: Levelling Up Kent – It will help maintain KCC’s strategic role in supporting schools in Kent to deliver accessible, high quality education provision for all families.

 

How the proposed decision supports Securing Kent’s Future 2022-2026: Securing Kents Future - Budget Recovery Strategy.pdf

 

This proposed decision is compliant with Objective 1 of Securing Kent’s Future, KCC as the LA proposes to expand Parkwood Hall Co-operative Academy.This proposal is necessary for KCC to continue to deliver the statutory duty, in a cost-effective way, in line with the guidelines described in the Securing Kent's Future 2022-2026 strategy.

 

The proposed new Strategic Statement will be presented to Full Council on 6 November 2025 and considered for adoption. As this FED was drafted prior to that date, it aligns with the relevant policies at the time. Even though the Cabinet Committee Paper will be published after 6 November 2025 Full Council meeting, it will have been drafted prior to the adoption of a new Strategic Statement and so will also refer to Securing Kent’s Future 2022-2026.

 

Financial Implications

 

Progression of the scheme will be dependent on the outcome of detailed feasibility and design work – these will inform the full overall cost of the scheme, at which point the formal decision will be taken by the Cabinet Member for Education and Skills. The project will be a school managed scheme and will be confirmed via legally binding funding and development agreements between KCC and Parkwood Hall Co-operative Academy.

 

The cost of the works will be borne by the CYPE High Needs Capital Budget; this is funded from a ring-fenced Capital Grant from the DfE. From initial feasibility studies, the estimated cost for the whole scheme was £1,500,000. However, after initial feedback from KCC Infrastructure colleagues, there is a possibility that costs may increase, primarily due to the possible need for additional Highways mitigations around the Parkwood Hall Co-operative Academy site and other requirements on the refurbishments of existing buildings. Therefore, we will not be requesting the formal decision to be taken until such time that planning is concluded, and the full extent of the cost of the scheme is known. The latest estimates indicate the costs could increase to as much as c£3,000,000, but much work still needs to be undertaken with Planners and Highways to determine the extent of any mitigations that may be required. 

 

For Special School capital projects, the average cost per student place for a school expansion in Kent is c£85,000. However, the higher estimated cost for this scheme equates to a cost per place of only c£42,000, which demonstrates good value for money.            KCC Project Managers will be undertaking continuous checks to keep build project costs as low as possible.

 

An allowance of up to £2,500 may be payable to Parkwood Hall Co-operative Academy to outfit each new teaching room with appropriate ICT equipment, such as touch screens or projection equipment. This will be met from the overall Capital allocation for this scheme.

 

The High Needs Capital Programme has been running since 2020-21 with a total combined budget of just under £109m of which £67m has been either spent or committed to current known schemes (as at Quarter 1 2025 capital monitoring reported to Cabinet in September 2025).In the same way as the Basic Need programme is managed, to ensure all schemes are prioritised appropriately and expenditure is controlled within available funding, any proposed new or additional capital expenditure, first needs to be considered by KCC Officers through Education Asset Board, before being progressed through the formal governance processes and included in the capital programme.

 

Should the scheme not proceed through to completion, any costs incurred at the time of cessation would become abortive costs and are likely to be recharged to Revenue. This would be reported through the regular financial monitoring reports to Cabinet. This would be a cost to the General Fund.

 

State funded Special School places are commissioned by Local Authorities and paid based on a rate per place. The rate per place for Parkwood Hall Co-operative Academy is currently between £30,430 to £31,400 dependent on the Key Stage. The higher rate forParkwood Hall Co-operative Academy is approximately c£30,000 less than a place in an independent Special School. Local Authorities use the High Needs Block of the Dedicated Schools Grant to pay for these places. Parkwood Hall Co-operative Academy will use the revenue income they receive to facilitate additional staffing requirements and increased running costs.

 

Legal Implications

 

Under the Children and Families Act 2014 KCC has a duty ‘to support the child and his or her parent, or the young person, in order to facilitate the development of the child or young person and to help him or her achieve the best possible educational and other outcomes’. By ensuring we have appropriate provision as locally as possible, we are delivering on our obligation in accordance with this legislation.

 

Local Authorities need to deliver their statutory duties and be aware of non-statutory guidance and advice, which relate to children and young people with SEN. These are:

·       Department for Education-Making significant changes to an academy 2025: non-statutory guidance on collaborative school place planning and making organisational changes to academies.

·       The Equalities Act which:  places duties on Local Authorities to review support services and in doing so requires Local Authorities to have due regard to the way in which any changes will affect children and young people with a disability.

·       The SEND Code of Practice places requirements on Local Authorities to: provide access to advice from a suitably qualified person as part of the EHCP process and subsequent “assess, plan, do, review” cycles, and make appropriate provision for those with an EHC plan in the 0-25 range.

·       Sufficiency Duties: KCC is under a statutory duty to contribute towards the spiritual, moral, mental, and physical development of the community by securing that efficient primary education and secondary education are available to meet the needs of the population of their area: section 13 of the Education Act 1996 (“the 1996 Act”).

·       KCC must ensure that its education functions are exercised by the authority with a view to promoting high standards, ensuring fair access to opportunity for education and training, and promoting the fulfilment of learning potential by every person under the age of 20 and those over the age of 20 and for whom an EHC Plan is maintained: section 13A. By section 14, KCC must secure that sufficient schools for providing primary and secondary education are available for their area, defined as being sufficient in number, character and equipment to provide for all students the opportunity of appropriate education.

·       Under section 27 of the Children and Families Act 2014 (“the 2014 Act”), KCC is under a duty to keep under review the educational provision, training provision and social care provision made in its area (and outside it) for children and young people who have special educational needs or a disability. KCC must consider the extent to which its provision is sufficient to meet the educational needs, training needs and social care needs of the children and young people concerned.

·       KCC, when carrying out its functions must have “due regard” to the provisions of section 149 of the Equality Act 2010, known as the ‘public sector equality duty’.

 

Planning permission will be required for the new accommodation to enable the expansion of the school’s accommodation. As part of the Funding Agreement, Parkwood Hall Co-operative Academy will be responsible for gaining the appropriate planning consent.

 

All individual proposals to either establish new, expand current or cease current provision will be required to go through the DfE process of making significant changes to an academy (non-statutory guidance on collaborative school place planning and making organisational changes to academies, August 2025).

 

The Director of Infrastructure in consultation with the Director of Education will be overseeing the scheme to ensure public funds are utilised appropriately.

 

Decision Maker: Cabinet Member for Education and Skills

Decision due date: Not before 19/11/2025 To allow 28 day notice period required under Executive Decision regulations

Lead officer: Ian Watts

Notice of decision: 21/10/2025

Anticipated restriction: Open