ePetition details

Traffic calming and safe pedestrians crossing required on Manston Road j/w Newington Road, Ramsgate

We the undersigned petition the council to Provide clear signage - warning road users of pedestrians crossing Manston Road (Grid ref: TR 37035 65426). Provide clear signage instructing road users to 'give way' to pedestrians crossing Manston Road (Grid ref: TR 37053 65419). Provide signage warning road users of school pedestrian traffic between the hours of 08.00 and 09.30 and 14.30 and 16.30 hrs) – (Grid Ref: TR 37061 65410). Improve crossing facilities for pedestrians to cross Manston Road and Newington Road (Especially on or near mini roundabout - Grid Ref: TR 37028 65426 and Grid Ref: TR 37062 65390). Use signage and/or traffic calming measures to reduce unpredictability of traffic movements in and out of Newington Road and Manston Road [mini roundabout] - Grid Ref: TR 37051 65428.

The pedestrian crossing points provided on Manston Road and Newington Road, Ramsgate - on or near the mini roundabout between St. Lawrence Church (High Street) and the old swimming pool site, Newington Road (Now acquired by Kent Fire & Rescue) are highly inadequate and we call on Kent County Council to improve the pedestrian safety, by calming or better controlling the traffic and providing pedestrians with safer crossing points.

Parents walking their children to and from St Laurence C of E Aided Junior Academy and between this school and Ellington Infants School, Ramsgate are faced with high volumes of peak time traffic, that corresponds with school opening and closing times.

Crossing the roads, especially Manston Road, is highly dangerous as most cars do not stop or giveway before entering Manston Road. Many parents from schools talk of near misses with cars, vans and bicycles when attempting to cross the roads (especially Manston Road – near the mini roundabout).

The risk of pedestrian injury here is increased by a number factors that relate to the road environment and the time of day, including:

? High volume of traffic
? high speed of traffic (at times)
? inadequate crossing facilities
? lack of pedestrian crossing opportunities (gaps in passing traffic)
? complexity and unpredictability of traffic movements at mini roundabout.

This ePetition ran from 11/12/2016 to 11/03/2017 and has now finished.

32 people signed this ePetition.