Agenda item

Application MA/13/2191 (KCC/MA/0363/2013) - Improvement of existing waste management facility to include use of adjacent industrial unit land, construction of two steel framed buildings to facilitate recovery and recycling of waste material, weighbridge, office, parking and revised boundary treatment at Units 6,13,14 and Adjacent Unit, Detling Aerodrome Industrial Estate, Detling; Pinden Ltd

Minutes:

RESOLVED that:-

 

(a)       permission be granted to the application subject to conditions, including conditions covering the development being commenced within 3 years; the development being carried out in accordance with the submitted plans and details and any approved pursuant to the following conditions;  the submission for approval of a final landscape and planting specification, in accordance with the principles detailed in the landscape masterplan received with the application; the submission for approval of a foul and surface water drainage scheme; the submission for approval of details of all external lighting; the submission for approval of details of any external storage outside the proposed pre-sort area; tree protection measures during construction; the implementation of the mitigation and enhancement measures proposed within the Ecological Appraisal; measures to be taken during construction if contamination not previously identified is found on site; precautions to guard against the deposit of mud on the highway during the construction period;  the buildings being  finished in green; the sorting and processing buildings being constructed using the insulated cladding set out within the application; the proposed 3m high concrete retaining walls being erected and retained on site;  the recommended improvements to the signage on the A249; controls on the hours of operation of the waste management facility to those applied for (0600 – 1800 hours on Mondays to Fridays, 0700 – 1700 hours on Saturdays, and no operations on Sundays and Public Holidays); the noise from the development at the closest noise sensitive properties not exceeding the predicted levels set out within the noise assessment; the entrance to the site being secured outside operational hours; all external lighting being extinguished outside of the permitted hours of operation (with the exception of low level security lighting or during any repair or maintenance); controls on the total combined waste throughput (to a maximum of 75,000tpa); only those wastes specified within the planning application, namely commercial and industrial waste (mainly skip waste) being received, deposited, stored or managed on site; no crushing of materials to take place on site; all biodegradable/ putrescible waste being removed within 48 hours of arrival on site; controls on the overall number of HGV movements to those applied for (265 HGV movements per day); records of all HGV movements and details of quantities of all waste handled at the site being maintained for a period of 3 years and being made available on request; all loaded, open backed HGVs entering or leaving the site being sheeted or netted;  only vehicles, storage containers and skips that are ancillary to the development being stored within the site; all vehicles, plant and machinery operated on site being maintained in accordance with the manufacturer’s specification at all times and being fitted with and using effective silencers; the mitigation measures set out with the dust and odour assessment received with the application being implemented and maintained on site; the hard surfacing on site being maintained in a good state of repair, kept clean and free of mud and other debris; measures to prevent the deposit of mud or other debris on the highway; unauthorised material deposited on site being removed to an authorised waste disposal facility within 48 hours; restrictions on stockpile heights for pre and post processed materials and skips (of not more than 4m); all sorting and processing taking place inside the buildings, with the exception of operations in the pre-sort area; the removal of permitted development rights; and the terms of the planning permission being made known to any person(s) given responsibility for the management of the site; and

 

(b)        the applicant be advised by Informative of:-

 

(i)              the need for precautionary measures if protected species are encountered during the course of the development; and

 

(ii)        the protection afforded to breeding birds should works be required to trees or shrubs on site between 1st March and 31st August.

 

Supporting documents: