Minutes:
(1) The Head of Planning Applications Group referred to a petition signed by 174 local residents in opposition to the application. This supplemented the 376 signatories who had signed the online petition referred to in paragraph 69 of the report.
(2) Mr R H Bird was present for this item as the Local Member and spoke. He informed the Committee that his contribution had been jointly agreed with his fellow Ward Member, Mr D S Daley.
(3) The Clerk to the meeting read out representations from Mr Neil Hammond (a local resident) and the response on behalf of the applicants from Mr David Molland (FCC Environment (UK) Ltd).
(4) On being put to the vote, the recommendation of the Head of Planning Applications Group were unanimously agreed.
(5) RESOLVED that:-
(a) permission be granted to the application subject to conditions, including conditions covering covering the implementation of the permission within 3 years; the submission for approval of a ConstructionManagement Plancoveringtherouting ofconstruction anddeliveryvehicles to/ fromsite,parkingandturningareas for constructionand deliveryvehiclesandsite personnel,timingof deliveries, provisionof wheelwashingfacilitiesand temporarytrafficmanagement / signage); highway condition surveys being undertaken before and after construction. withthe repair ofanydamage causedbyvehiclesrelatedto thedevelopment being funded by the applicants; the provisionof constructionvehicleloading/ unloadingand turningfacilities, parking facilities for site personnel and visitors and wheel washing facilitiespriorto commencement ofwork onsiteand forthedurationof construction; the provisionof measuresto preventthe discharge ofsurfacewater ontothe highway; the provisionand permanentretentionofthe vehicleparkingspacesand /or garages,the vehicleloading/unloadingandturningfacilitiesandthe cycle parkingfacilitiesshown onthe submittedplans priorto theuseof thesite commencing; use ofa boundsurfacefor thefirst 5metres ofthe accessfromthe edge ofthe highway; completionand maintenanceof theaccessshownon thesubmitted planspriorto theuseof thesitecommencing; the provisionandmaintenanceof 2.4metreby43 metrevisibilitysplaysat the access,with noobstructions over0.6metres abovecarriagewaylevel within thesplays,prior touseof thesite commencing; implementation of the proposed measures to avoid queuing at the AllingtonIWMF onLaverstokeRoad (withprovisionfor annualreviews andamended measuresbeingagreedwith KCCas necessary); hoursof use(i.e. toallowthe HWRCto beopento thepublic) being between 0700and 2000hours on weekdays, weekendsandon BankHolidays(but closedon Christmas Day,BoxingDay andNew Year’sDay) withsite maintenance/ cleaningand otheroperational activitiesbeing allowedduring the30 minutes beforethe siteopens and30 minutes afterthe sitehas closedto thepublic; the submission for approval of a ConstructionEnvironmentalManagementPlan (CEMP); Enablingand Constructionworksonlytakingplacebetween 0700and 1800 onweekdaysand Saturdaysunlessotherwiseapprovedinthe CEMP; the submission for approval of an operationalDust ManagementPlan(DMP); the submission for approval of asiteOdour ManagementPlan(OMP); no occupation of any part of the development taking place until a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation has been submitted to and approved in writing by KCC; developmentworksceasingif contaminationnot previouslyidentified is foundtobepresentat thesiteuntila furtherremediationstrategyhas beensubmittedto andapprovedin writingby KCC; no pilingorany otherfoundationdesignsusingpenetrativemethods taking place unlessapprovedin writingby KCC; theimplementationof adetailedplantingplan; treeprotectionmeasures; the removalofpermitteddevelopmentrights; avoidanceoftreeremovalduring thebird nestingseason; allplanting, seedingor turfingbeing carriedout inthe firstavailable plantingandseedingseasonfollowingthe occupation ofthe siteor the completionof thedevelopment(whicheveristhesooner); anaftercareperiodof nolessthanfiveyears; theuseof adark colouredroofingmaterial; adetailed lightingscheme; detailsof fouland surfacewater seweragedisposal; the submission for approval of adetailed sustainablesurfacewater drainagescheme anda verification report; theimplementationof ecologicalcompensationmeasures(an Ecological DesignStrategy); and post-developmentmanagementfor theecologicalfeatures(a Landscape andEcologicalManagementPlan); and
(b) the applicants be advised by Informative:-
(i) that they need to ensure that all necessary highway approvals and consentsareobtained;
(ii) that if pilingis proposed, a Piling Risk Assessment must be submitted to the Environment Agency in accordancewith theEnvironmentAgencyguidancedocumentPiling and Penetrative GroundImprovementMethodson LandAffectedby Contamination:Guidance onPollutionPrevention.NationalGroundwater &ContaminatedLand CentrereportNC/99/73;
(iii) of the needfor aTradeEffluentdischarge licenceand foran applicationto bemade toSouthernWater toconnect to thepublicfoul andsurfacewatersewer; and
(iv) of their obligations under the Wildlife and CountrysideAct 1981inrespectof nestingbirds.